Design Package | Inputs and Deliverables
Overview & How it Works
This article details our current design modeling criteria and deliverables expected from all approved design platforms. Following these modeling inputs is required on all LightReach sales.
Here's how it works:
Failure to follow design requirements, or intentional misuse of modeling criteria to artificially impact homeowner value propositions, may result in the termination of access to the LightReach product.
M1 Deliverables: Design Package Documents
Key Deliverables | Details |
1) Production Model | Confirmation that the Inputs were set properly by the user:
|
2) Shading Report | Only Required if any of the following conditions are met:
Confirmation that Shading was properly modeled:
|
3) Plan Set | Required pages of the Engineering Plan Set submitted to the building department:
|
Examples by Platform: Design Package Documents
Platform | Production Model | Shading Report | Plan Set |
Aurora | |||
Solargraf | |||
PV Watts | Not required. Upload a placeholder file. | Shade Report (Will need one file per different pitch/azimuth) |
General Approved Inputs:
Below are general approved inputs, agnostic of specific platform:
Key Input | Details |
Approved Modeling Software/ Production Engine
|
Modeling Software/production engines must be used in conjunction with an approved design platform. |
Approved Weather Data | In order of preference:
|
Shade Report | Only Required if any of the following conditions are met:
Must be used when available. If not available for the property, manual accounting for any surrounding objects casting shade (trees, structures), etc must be accurately modeled. Acceptable Shade Models.
|
Approved Platforms: Settings & Inputs
Platform | Inputs |
Aurora |
Click here for inputsNavigating to project settings for Individual Aurora projects. * Images above for illustrative purposes
|
Solargraf |
Click here for inputsDue to platform not displaying a total system loss, please following the data below along with the snow loss per state:
|
PV Watts* (Cannot be used if 'shade report' is required) |
Click here for inputs
|
System Loss Settings
State(s) | Snow Loss (Only use if design platform does not have a total value) | Minimum System Loss without Shade Loss (Includes Snow Loss) | Minimum PV Watts System Loss without Shade Loss (Includes Snow Loss) |
| 0% | 9.1% | 14.1% |
| 4% | 12.3% | 17.5% |
Plan Set & Line diagram requirements: As built & Revisions
Disclaimer: IL will require updated plans for both major and minor changes.
β
As built changes are categorized into two:
MAJOR CHANGES
CATEGORY | WHAT CHANGED? | AS BUILT PLANS AT M2 |
PV Module / Inverter / Battery |
| REQUIRED |
Solar Layout | Modules moved to:
| REQUIRED |
MINOR CHANGES
CATEGORY | WHAT CHANGED? | AS BUILT PLANS AT M2 |
Racking |
| NOT REQUIRED |
Solar Layout | Module location / orientation changes within the same roof plane | NOT REQUIRED |
Electrical |
| NOT REQUIRED |
Other | Any other changes not listed above | NOT REQUIRED |