Skip to main content

NHP: Incentive Deliverables - M1 Milestone

Alvin - PLR Product Ops avatar
Written by Alvin - PLR Product Ops
Updated over a month ago

Incentive Deliverables - M1 Milestone

This article provides guidance on incentive requirements (if applicable) when submitting for M1 milestone.

This article details our current incentives deliverables required at Install (M1) milestones on all LightReach sales. There are two primary considerations:
​

  1. System Pre-Requisites: IE Sales requirements pertaining to the system that are necessary to qualify for incentives altogether.

  2. M1 Documents: Documents and submission items required as part of the M1 package in applicable markets.

Failure to follow pre-requisites or submit incentive requirements will result in the rejection of M1 milestone.

System Pre-Requisites by State:

State

Pre-Requisite

N/A

N/A

M1 Documents: Submission Requirements

Images linked below can be found here: Incentive Requirements Checklist . Submitting M1 documents without as-built information, or omitting documents altogether , will result in the rejection of the M1 milestone.

State

Document 1

Document 2

N/A

N/A

N/A

Did this answer your question?